加油站业务 Petrol/Gasoline station service
公司在中国不同地方新建,租赁或收购加油站加气站,长远规划到国外运营加油站。The company operate Petrol/gasoline station, has newly-built a new lease or purchase of Petrol/LNG/CNG filling stations in different parts of China, and strategy to operate the gasoline stations in world wide.
公司液化天然气战略规划Company LNG Strategy Plan:
液化天然气接收站码头和液化天然气储存库198万方;占地1平方公里LNG receiver terminal and LNG Storage(1.98 million cubic meter; 1 sqKM):
一期项目规模:1个浮式液化天然气接收站码头2.632万方或14.5万立方米级别;3个16.5万立方米液化天然气储存冷库(零下162摄氏度)。
1st phase capacity: one FSRU(Floating Storage and Regasification Unit) terminal for 26 320 or 145 000 cubic meters LNG reciever; three LNG storages (Size: 3 x 165 000 cubic meters , -162C).
二期项目规模:2个液化天然气接收码头14.5万立方米级别和9个液化天然气储存冷库(零下162摄氏度)。
2nd phase capacity: Two LNG Reciever and Regasification terminal (size: 2 x 145 000 cubic meters LNG carrier); nine LNG storages (Size: 9 x 165 000 cubic meters, -162C).
公司油库战略规划Company oil storage Strategy Plan:
油库和接收站码头 350万方油库,占地1平方公里Oil receiver terminal and Storage Tank(3.5 million cubic meter; 1 sqKM):
一期项目规模:1个原油接收站码头30万吨级别和6个5和10万吨级别成品油码头;108万立方米油库(6 x 10 + 6 x 5 + 6 x 3 成品油库)。
1st phase capacity: one crude oil receiver terminal for 300 000 DWT carrier; oil product 6 x 50 000 DWT; 6 x 100 000 DWT berths; 1 000 000 Cubic meters Oil storage tanks (Size: 6 x 100 000 cubic meters Crude oil tank,6 x 50 000 & 6 x 30 000 Cubic meters oil product tank).
二期项目规模:1个原油接收站码头30万吨级别和1个45万吨级别原油码头;240万立方米油库(24个10万方库)。
2nd phase capacity: one crude oil receiver terminal for 450 000 DWT carrier and 1 x 300 000 DWT; 2 400 000 Cubic meters Oil storage tanks (24 x 100 000 cubic meters).
天然气发电厂一期3 x 600 MW Natural Gas power plant for phase 1 ; 二期 18 x 600 MW for 2nd phase.